The short answer
A production planning system has to answer three questions: what to make and when, whether you will have the materials, and whether you will have the capacity (people and machines) to hit the date you promised. Most manufacturers in Lithuania solve this in one of three ways: the production module of their ERP or accounting system, a specialised planning (APS) or manufacturing execution (MES) system, or a custom planning layer connected to the accounting system they already use.
The right route depends less on company size than on how you manufacture. If you make repeat products from stable bills of materials, an ERP production module is usually enough. If you build to order, every order is slightly different and a couple of expensive machines are the bottleneck, a standard module often cannot produce a realistic schedule, and APS or a custom solution is worth a look. Either way, the system will only be as good as your bills of materials, operation times and stock data.
This guide is for managing directors, production managers and IT managers at manufacturing companies who are choosing a system. Facts and dates were checked on 24 November 2026.
Signs your production planning has outgrown Excel
Excel and an accounting package work well while one person plans production and keeps everything in their head. Trouble starts when:
- Delivery dates are guesswork. Sales cannot check whether an order really fits before the promised date because they cannot see the load from other orders.
- Material shortages are discovered on the shop floor. A job is released, and only then does someone notice a component that should have been ordered three weeks ago.
- The plan changes daily, but nobody sees the knock-on effects. A rush order is squeezed in, and you only find out which other orders slip when they are already late.
- You only know the real cost a month later. Actual material and labour use is collected by hand, so loss-making orders are spotted too late.
- One person is the system. When the planner is on holiday or off sick, planning stops.
We covered the broader warning signs in Excel vs a custom system: 7 signs you have outgrown spreadsheets. Here we focus on production.
ERP, MRP, APS and MES: who does what
These acronyms get mixed up, and vendors often describe their products more broadly than they actually work. It helps to separate the question each type of system answers.
| System | Question it answers | Typical data | Time horizon |
|---|---|---|---|
| ERP (business management system) | What was sold, bought and held in stock, and what it cost | Orders, stock, purchasing, invoices, cost of goods | Months, years |
| MRP (material requirements planning) | Which materials are needed, and when, to complete the orders | Bills of materials, stock, supplier lead times | Weeks, months |
| APS (advanced planning and scheduling) | In what sequence and on which machines to produce, given limited capacity | Operations, machines, shifts, changeover times | Days, weeks |
| MES (manufacturing execution system) | What is actually happening on the shop floor right now | Start and finish of operations, quantities, scrap reasons, downtime, batches | Minutes, shifts |
The international ISA-95 standard (IEC 62264) separates these areas into levels: business planning and logistics (ERP) is level 4, manufacturing operations management (MES) is level 3, and machine control and sensors sit below that. The standard focuses mainly on the interface between levels 3 and 4. In practice that gives you a simple rule: decide up front which system is the source of truth for each piece of data (for example, ERP owns orders and stock, while MES or shop-floor terminals own actual operation times), and never let the same data be edited in two places.
A typical mid-sized Lithuanian manufacturer rarely needs four separate systems. A more common setup is an ERP with a production module plus simple shop-floor data capture, with APS or a custom planning tool added only when capacity planning becomes the real bottleneck.
What a production planning system should do
The features below are listed roughly in the order in which they pay off. The first three are worth having from day one; the rest can come in stages.
1. Bills of materials and routings
A bill of materials (BOM) says which materials and sub-assemblies go into a product and in what quantities. A routing says which operations are performed, at which work centres or machines, and how long each takes (setup time plus run time per unit). Without both, no system can calculate either material requirements or machine load.
In make-to-order production the BOM is often created per order. In that case the system should be able to generate it from parameters (dimensions, material, finish) or copy it from a similar product, rather than having someone key it in from scratch every time.
2. Material requirements
Based on confirmed orders and the forecast, the system explodes the BOMs, nets off stock on hand and on order, and suggests what to buy or make and when. The key parameters are supplier lead times, minimum order quantities and safety stock. If they are missing or out of date, the suggestions will be wrong, and planners will drift back to Excel.
3. Capacity planning and a realistic delivery date
This is where standard modules differ most. Simpler tools plan with infinite capacity: they show that a machine is overloaded but do not move the work. More advanced tools plan with finite capacity: jobs are slotted into free time, taking shifts, changeovers and operation sequence into account. When you have many orders and one or two machines are the bottleneck, finite capacity planning is what lets sales quote a realistic date.
A useful feature is promise checking: before an order is confirmed, the system checks whether the materials and free capacity will be there in time. Some systems also show available-to-promise (ATP) quantities based on stock and plan.
4. Work orders and shop-floor feedback
The plan has to reach the shop floor: work orders with drawings, instructions and quantities at the workstation, on a tablet or a terminal. The facts have to come back: when an operation started and finished, how many were made, how much was scrapped and why. Barcodes or QR codes on work orders and a simple start/stop button are usually enough. Without that feedback, the plan stops matching reality within days.
5. Batch traceability and quality
If you need to trace which raw material batch went into a given product, traceability has to be designed in from the start. For food and feed producers it is a legal duty: Article 18 of Regulation (EC) No 178/2002 requires businesses to identify who supplied them and to whom they supplied their products (the "one step back, one step forward" principle), and to make that information available to the authorities on request. In other industries, traceability requirements usually come from customer contracts and certification schemes.
Data demands will grow over the next few years. Digital product passports are being introduced under the EU Ecodesign Regulation (EU) 2024/1781. According to the European Commission's indicative timeline, a digital passport becomes mandatory for certain types of batteries from 18 February 2027, the delegated acts for textiles, tyres and aluminium are planned for adoption in 2027, and the one for furniture in 2028. Once a delegated act is adopted, businesses are expected to get a transition period of at least 18 months. For furniture makers this is not this year's job, but if you are choosing a system now, make sure it stores material and batch data in a structured way rather than in free-text fields.
6. Costing and KPIs
Once the system knows planned and actual material and labour use, you can see the cost of each order rather than waiting for month-end. The most commonly tracked indicators are on-time delivery, machine utilisation, actual versus standard operation time, and scrap. If you collect data from machines, you can also calculate OEE (overall equipment effectiveness). It is most often calculated as availability multiplied by performance multiplied by quality, but systems define it differently: Odoo's OEE, for example, shows the share of fully productive time at a work centre. ISO 22400-2 standardises KPI definitions for manufacturing operations management, so agree on the formulas before you start comparing figures across plants or systems.
The data to fix before you implement anything
The most common reason a production planning project disappoints is not the software but the data. Before choosing a system, check:
| Data | What to check | Owner |
|---|---|---|
| Bills of materials | Do they match what is actually built, and are sub-assemblies defined? | Process or design engineer |
| Operation times | Are standards based on measurement rather than numbers entered years ago? | Production manager |
| Work centres and machines | Shifts, working hours, which machines can substitute for each other | Production manager |
| Stock | Do system balances match what is physically in the warehouse? | Warehouse manager, accounting |
| Supplier lead times | Are real lead times known for the main materials? | Purchasing manager |
| Item codes | Does the same material have several codes across systems? | Everyone together |
A practical way to start is to pick one product family or one workshop, clean up its data and launch planning there. Experience in one place quickly shows which data the whole company is missing.
Three routes: ERP module, specialised system or custom build
| Criterion | Production module in your ERP or accounting system | Specialised APS or MES | Custom planning layer |
|---|---|---|---|
| Best fit | Repeat products, stable BOMs, few constraining machines | Complex scheduling, many machines, frequent changeovers, shop-floor data capture | Make-to-order with configurable products, specific rules that are hard to configure |
| Accounting integration | Same system, if accounting lives there too | Needs an interface to the ERP | Needs an interface to the ERP or accounting |
| Implementation time | Usually the shortest | Depends on the system and integrations | Depends on scope, can be phased |
| Flexibility | Limited to standard features | High for planning, limited elsewhere | Highest, but everything has to be designed |
| Main risk | Planning stays in Excel because the module does not match reality | Yet another system with its own data | Dependence on the developer if there is no documentation or code ownership |
Production module in your ERP or accounting system
Many systems used in Lithuania include production features. Rivilė GAMA's production module, for instance, handles assembly and disassembly operations based on costing cards: it writes off components and receives the finished product into stock at cost. According to the vendor, Directo's production module covers production orders, a production recommendation report, a planning timeline and time logging for operations. Odoo's Manufacturing app has bills of materials, work centres with working hours and capacity, and a master production schedule (MPS) that suggests replenishment quantities based on the forecast and safety stock.
Before deciding, ask the vendor to walk your typical order from sale to finished goods in stock, using your own data. If you already run one of these systems for accounting, its production module is often the cheapest first step. We compared Odoo's cost and implementation with a custom build in Odoo vs a custom business management system.
Specialised APS or MES
Specialised systems are strongest exactly where ERP modules are weakest: finite capacity scheduling, changeover optimisation, shop-floor terminals and machine data collection. They almost always run alongside an ERP, so the key question for the vendor is integration: which data flows which way, how often, and what happens when the interface is down.
If you want to collect data straight from machines, find out which protocols your equipment supports. OPC UA, a standard from the OPC Foundation, is widely used in industry and includes encryption, authentication and audit logging. Older machines often need extra sensors or controllers.
A custom planning layer
The third route is not to replace your accounting system or ERP, but to build a planning and order management application that pulls data from the existing system and writes results back to it (quantities produced, material write-offs, cost). It is worth considering when:
- products are configurable (dimensions, options), so BOMs and operations need to be generated automatically from the order;
- your planning rules are a competitive advantage, for example how you group orders by material to cut waste;
- customers or sales reps need to see order status through a self-service portal;
- your existing accounting system works fine and you do not want to replace it.
We explain how to connect a solution like this to Rivilė, Directo or Agnum in Integrating Rivilė, Directo and Agnum accounting systems. If you take orders from business customers, a B2B customer portal can sit on top of the production plan so customers see the confirmed date and order progress without having to call.
Example: what a phased rollout could look like
The following example is fictional and the figures are illustrative. Company X builds metal structures to order, has about 60 employees, a laser cutter, a press brake and welding stations. Its accounting runs on Rivilė GAMA, and the plan lives in an Excel sheet maintained by a single planner.
- Diagnosis (2-3 weeks). It turns out the press brake is the bottleneck, but most delays are caused not by capacity but by sheet metal that was not ordered in time.
- Phase 1: orders, BOMs and material requirements. Order management moves into the system, BOMs are generated from drawing parameters, and material requirements are calculated automatically and passed to purchasing.
- Phase 2: shop-floor feedback. Tablets with work orders and QR codes appear at the machines and stations. Actual operation times start being compared with standards.
- Phase 3: capacity planning. Once actual times are reliable, finite capacity planning is switched on for the press brake, and sales can see a realistic date before confirming an order.
- Accounting integration. Produced quantities, write-offs and costs are sent to Rivilė GAMA once a day, so nothing is keyed in twice.
The point of the example: phase 1 tackles the biggest problem (material shortages), while the hardest part (schedule optimisation) is only rolled out once there is reliable data to feed it.
Is EU funding available?
The Innovation Agency's call No 02-126-K "Deployment of artificial intelligence solutions" is aimed at industrial SMEs, and its applicant briefing lists production planning among the manufacturing processes where an AI solution can be deployed. Project implementation plans can be submitted until 17:00 on 8 December 2026; grants range from EUR 15,000 to EUR 70,000 and cover up to 50% of eligible costs.
It is important to understand the limits. Only the deployment of an AI product or solution already on the market is funded, not one developed to order, so an ordinary ERP or MRP system without AI, or a custom-built solution, does not qualify under this call. AI solutions for general business processes, such as accounting, procurement or sales forecasting, are listed as ineligible in the briefing. Project activities cannot start before the plan is registered, and the first legal commitment to buy the AI solution counts as the project start. We cover the full conditions and pitfalls in AI in manufacturing with 50% EU funding.
Questions to ask a vendor before you sign
- Can you walk our typical order from sale to warehouse using our data rather than demo data?
- Does the system plan with finite capacity, or does it only show overloads?
- How are configurable products and per-order BOMs handled?
- How do shop-floor staff log the start, finish, quantity and scrap of an operation? How many taps does that take?
- Which system is the source of truth for stock, orders and cost, and how is data synchronised with our accounting system?
- What happens when the interface to accounting is down? Is data queued and sent later?
- Is there an API, and is it included in our licence plan?
- How can we export all our data if we decide to switch systems?
- What will licences, implementation and annual support cost over five years, including user growth?
- Who will own the customisations and integrations built for us?
The last two are worth writing into the contract. We cover what to put in it on acceptance, code ownership and support in Software development contract and SLA.
Common mistakes
- Buying a system before fixing BOMs and operation times. The plan is then calculated from bad data, and planners go back to Excel.
- Trying to optimise the schedule straight away. Without reliable shop-floor data, optimisation just produces an unworkable plan faster.
- Letting the same data be edited in two systems. Stock levels or order statuses drift apart within weeks.
- Leaving shop-floor supervisors out of the selection. If logging data takes too long, it simply will not happen.
- Forgetting traceability. Adding batch tracking later is much harder than designing it in from the start.
FAQ
Is an accounting package enough for production planning?
It is often enough for BOMs, material write-offs and costing. For capacity planning, shop-floor work orders and realistic delivery dates, the production modules of accounting packages are usually more limited, so test them against one of your typical orders.
How is APS different from MRP?
MRP calculates which materials are needed and when. APS builds a schedule that respects the limited capacity of machines and people. Many companies get MRP right first and add APS once capacity becomes the bottleneck.
How long does implementing a production planning system take?
It depends heavily on how complex your production is, the state of your data and the integrations involved. The most reliable way to reduce risk is to roll out in phases: orders, BOMs and material requirements first, then shop-floor feedback, then capacity planning.
Do we need to connect machines to the system?
Not necessarily. For most companies, operations logged by staff on a tablet or terminal are enough. Automatic machine data collection is worth considering when you want to measure downtime or OEE accurately and your machines can expose data through standard protocols.
Won't a custom system lock us into one developer?
It can, if the contract does not secure code ownership, documentation and a handover plan. With those in place, another team can take over a custom solution.
What to do next
Start with something simple: take three late orders from last month and find out why they were late. If the cause was materials, start with BOMs and material requirements. If it was capacity, start with shop-floor feedback and operation times. That answer often tells you more than any feature list.
DESAmedia builds business management systems, including order management and production planning solutions, and connects them to accounting software through integrations and automation. If you would rather first assess which route suits you, we can do that through IT consulting and system design. You can tell us about your situation via the contact page.
Sources
- ISA. ISA-95 Series of Standards: Enterprise-Control System Integration (IEC 62264)
- ISO 22400-2:2014. Key performance indicators for manufacturing operations management
- OPC Foundation. OPC Unified Architecture
- European Commission. General food law requirements, traceability (Regulation (EC) No 178/2002)
- European Commission. Guidance on the implementation of Articles 11, 12, 14, 17, 18, 19 and 20 of Regulation (EC) No 178/2002 (PDF)
- European Commission. Digital Product Passport (indicative timeline)
- European Commission. Ecodesign for Sustainable Products and Energy Labelling Working Plan 2025-2030, COM(2025) 187 (EUR-Lex)
- Rivile GAMA guide. Production (in Lithuanian)
- Directo ERP. Production module (in Lithuanian)
- Odoo 19.0 documentation. Work centers
- Odoo 19.0 documentation. Overall equipment effectiveness
- Odoo 19.0 documentation. Master production schedule
- Innovation Agency. Deployment of artificial intelligence solutions, call No 02-126-K (in Lithuanian)
- Innovation Agency. Applicant briefing for the call, November 2026 (PDF, in Lithuanian)